Route 202 Widening Project

Print
Press Enter to show all options, press Tab go to next option

Widening Route 202 between North Valley Road and the Route 30 bypass - Construction began in April 2011 for widening of Route 202 from 4 to 6 lanes. The project should last through the Summer of 2014. Visit the US 202 website for information on transit and carpool alternatives during this construction.